Closure at Pinkston Bascule Bridge

Update 20th June

Works to replace the deck on Pinkston Bascule Bridge have been completed ahead of schedule and the bridge has now reopened.

12th June

Pinkston Bascule Bridge will be closed to pedestrian traffic from Monday 12th June for up to 3 weeks whilst work is undertaken on the bridge.

An alternate route is available via Craighall Road for the duration of the works. Signage will be in place.

Boat traffic will  not be affected.

Share this Story