Main

This year (2025), marks a significant milestone: 25 years since the opening of M8 Bridge 21A at Broxburn on the Union Canal.

This bridge represents a turning point in the story of Scotland’s inland waterways. Once a vital industrial artery, the M8 of its time - the Union Canal fell into decline, becoming a quiet rural byway. In the 1960s and 70s, the construction of the M8 motorway severed key sections of both the Union and Monkland Canals, disrupting their historic routes.

But the tide turned with the Millennium Link project—a restoration effort to reconnect Scotland’s canals. As part of this initiative, Bridge 21A was constructed beneath the M8, reuniting the canal and restoring navigation through this beautiful stretch. On its opening day in 2000, boats from Linlithgow and Ratho met bow-to-bow in a symbolic gesture of reconnection.

Today, we honoured that moment with a vibrant gathering of boats and a recreation of the original “canal handshake” between  the late Ronnie Rusack and Mel Gray, this time joined by members of the Lowland canal societies.

Among those who witnessed the original celebration was our very own Chief Executive, John Paterson—then a proud piper with the Drambuie Pipe Band.

See more from the original opening ceremony here.

Kelvin Aqueduct Repair Plan and Reopening Date Announced

Scottish Canals is conducting a major programme of investigation, design and repairs on the historic Kelvin Aqueduct in Maryhill, Glasgow, together with contractor Mackenzie Construction. Repair work has now begun and this section of the canal will reopen on 1st March 2027.

Date
18 Aug 2026
Canal
Forth & Clyde Canal

Maryhill exhibition brings 240 years of canal engineering history to life

A new exhibition, entitled Every Picture Tells a Story, opened at Maryhill Burgh Halls on Thursday 13th August.

Date
13 Aug 2026
Canal
Forth & Clyde Canal

Scottish Canals extends major engineering programme on the Forth & Clyde Canal in Falkirk

Scottish Canals has announced an extension to its largest programme of canal engineering works in 25 years. 

Date
29 Jul 2026
Canal
Forth & Clyde Canal
half-circleicon-accessibleicon-adult-onlyicon-arrow-45icon-arrow-whiteicon-arrowicon-articon-boatingicon-campingicon-chandleryicon-charge-pointicon-checkmark-tickicon-chevron-thinicon-chevronicon-closedicon-closureicon-community-consultationicon-crossicon-cyclingicon-de-masting-craneicon-dog-friendlyicon-dog-walkingicon-downloadsicon-educationalicon-elsanicon-engineering-marvelicon-environmentalicon-eventsicon-facebookicon-family-friendly-pathicon-family-friendlyicon-fishingicon-food-drinkicon-fuelicon-grid-viewicon-hamburgericon-health-wellbeingicon-heritageicon-instagramicon-land-activitiesicon-landscaped-areaicon-laundryicon-linkedinicon-living-on-watericon-location-pinkicon-locationicon-menu-crossicon-navigation-affectedicon-nessieicon-newsicon-no-campingicon-no-swimmingicon-overnight-staysicon-paddlingicon-parkingicon-photo-pointicon-placemakingicon-playicon-plusicon-point-of-interesticon-pump-outicon-quotesicon-refuse-disposalicon-runningicon-safetyicon-searchicon-shoppingicon-showers-toiletsicon-storage-shedsicon-sustainabilityicon-swimmingicon-tickicon-ticketicon-toilets-neutralicon-toiletsicon-twittericon-volunteeringicon-walkingicon-warningicon-waste-oil-disposalicon-water-activitiesicon-water-supplyicon-wildlife-watchingicon-youtubelogo-bluelogo-white