Gairlochy Lock Gate replacement

Progress with the fabrication and installation of new lock gates for Lock 17 on the Caledonian Canal were completed in April 2021.

Date
01/04/2020
Category
Safety
Status
Complete

Leamington Lift Bridge

Following an internal inspection, Leamington Lift Bridge was deemed to be a public safety and operational risk in 2018. Essential works to upgrade the bridge were complete in July 2019.

Date
01/12/2019
Category
Safety
Status
Complete

Almond Feeder

Investigative works to the embankments of the Almond Feeder, the main water supply to the Union Canal, began in 2018/19, and were completed in Autumn 2019.

Date
13/09/2019
Category
Safety
Status
Complete

Old Basin House

Old Basin House occupies a prominent position on Glasgow’s Applecross Street, adjacent to the Scottish Canals Glasgow Office. We’ve recently restored this Category C listed building with support from several funders.

Date
24/05/2019
Category
Developing new spaces
Status
Complete

Forth & Clyde Canal bridges

Following the £1.625 million of additional funding from the Scottish Government, we are now able to carry out the works to both Bonnybridge and Twechar Bridges.

Date
02/05/2019
Category
Safety
Status
Complete

Loch Dochfour Reservoir

A study of the dam breach and review of the flood assessment for Loch Dochfour Reservoir was completed in 2018/2019. A breach study is set to take place by March 2021.

Date
01/10/2018
Category
Safety
Status
Complete

Safeguarding Caledonian Canal’s 200-year-old Ness Weir

The 200-year-old Thomas Telford-built Ness Weir on the Caledonian Canal has undergone a major refurbishment, extending the structure’s lifespan by a century.

Date
24/02/2018
Category
Safety
Status
Complete

Re-think the link – Crinan Corridor Charrette

Scottish Canals and Argyll & Bute Council held a series of collaborative design workshops, known as a ‘charrette', to help shape the future of the Crinan Canal Corridor.

Date
04/04/2016
Category
Developing new spaces, Community
Status
Complete

Woodside, Firhill and Hamiltonhill Charrette

The Applecross-Woodside-Hamiltonhill-Firhill charrette was held over 4 intensive days in February 2015 and included design workshops, arts activities, site visits and presentations with the aim of creating a shared plan for the area.

Date
26/05/2015
Category
Community, Developing new spaces
Status
Complete
half-circleicon-accessibleicon-adult-onlyicon-arrow-45icon-arrow-whiteicon-arrowicon-articon-boatingicon-campingicon-chandleryicon-charge-pointicon-checkmark-tickicon-chevron-thinicon-chevronicon-closedicon-closureicon-community-consultationicon-crossicon-cyclingicon-de-masting-craneicon-dog-friendlyicon-dog-walkingicon-downloadsicon-educationalicon-elsanicon-engineering-marvelicon-environmentalicon-eventsicon-facebookicon-family-friendly-pathicon-family-friendlyicon-fishingicon-food-drinkicon-fuelicon-grid-viewicon-hamburgericon-health-wellbeingicon-heritageicon-instagramicon-land-activitiesicon-landscaped-areaicon-laundryicon-linkedinicon-living-on-watericon-location-pinkicon-locationicon-menu-crossicon-navigation-affectedicon-nessieicon-newsicon-no-campingicon-no-swimmingicon-overnight-staysicon-paddlingicon-parkingicon-photo-pointicon-placemakingicon-playicon-plusicon-point-of-interesticon-pump-outicon-quotesicon-refuse-disposalicon-runningicon-safetyicon-searchicon-shoppingicon-showers-toiletsicon-storage-shedsicon-sustainabilityicon-swimmingicon-tickicon-ticketicon-toilets-neutralicon-toiletsicon-twittericon-volunteeringicon-walkingicon-warningicon-waste-oil-disposalicon-water-activitiesicon-water-supplyicon-wildlife-watchingicon-youtubelogo-bluelogo-white